Dredging Project Pictures

Below are pictures of the Clear Lake dredging project. Lake dredging began in July of 2008 and will be completed by the fall of 2009.  A total of 2.3 million cubic yards of sediment will be removed from the lake bottom, increasing maximum lake depth from 6 ft to over 20 ft.

Dredge Barge on Clear Lake 

Aearial Photo of Dredge Barge 

Dredged Material Entering Containment Site (courtesy of Globe Gazette) 



Dredge Cutter Head 

Dredged Material Containment Site 

Water Being Returned to Clear Lake via Ventura Marsh 

 